Production sequence

How a run is made

01

Yarn preparation

Thread is selected for the fabric specification, then wound and warped onto the beam with precise tension control.

02

Loom weaving

The loom is set up for the required density and structure, and weaving is monitored continuously to keep the cloth stable.

03

Finishing and inspection

Every roll is inspected during finishing and checked before it is packaged for trade shipment.

Planning a production run?

Share your technical specifications and upcoming production timing, and we can talk through the next step.